Which is the best shear wall formwork support

Time:2022-07-15 09:19:40View count:



Which is the best shear wall formwork support? It is a problem that builders need to solve when looking for material suppliers. Company reputation is a very important reference factor, because reputation is slowly accumulated. Companies with good reputation have been verified by many builders, so they are more worthy of choice and trust. Now let's take you to Qinhuangdao Shengchuan building materials Co., Ltd. Let's learn about the formwork support system




1. The support system shall be equipped with sweeping rods, longitudinal and horizontal horizontal tie rods, horizontal and vertical diagonal bracing, and firmly tied with the wall columns of the main structure.




2. The pole (column) colon must be butted, and overlapping is strictly prohibited; The floor sweeping rod, longitudinal and horizontal horizontal tie rods and horizontal and vertical diagonal bracing must be overlapped.




3. An iron base and base plate must be set between the bottom of the pole and the top surface of the foundation.




4. When the axial load of the pole is greater than 8kN, an adjustable supporting formwork must be set at the top of the pole to form an axial compression load transfer.




5. The spacing of vertical poles shall be determined according to the load, which is generally not more than 1.2, and meet the following requirements: (1) the main vertical pole shall be set at the bottom of the beam, and the auxiliary vertical pole shall be set at the side of the beam. When the beam bottom is a single main support pole, it should be set at the center line of the beam width; (2) The spacing of vertical poles along the longitudinal direction of the beam shall be equal to or multiple of the spacing of vertical poles of the same direction plate. (3) When the beam and slab poles are set continuously along the transverse direction of the beam, they should be laid from the beam support to the center of the slab in two directions, but the spacing between two adjacent poles in the center of the slab should not be greater than the design spacing of poles at the bottom of the slab.




6. Horizontal tie rods (cross bars) must be used to connect the vertical and horizontal poles of each row and column.




Qinhuangdao Shengchuan building materials Co., Ltd., founded in 2014, is a production and sales enterprise of new shear wall formwork support system structure, new roof support system structure and buckle scaffold for construction. After years of development, it has become a comprehensive enterprise integrating scientific research, production, sales, leasing and service. Qinhuangdao Shengchuan building materials Co., Ltd. is located at the junction of northeast, North China and southeast coastal provinces, with high-speed railways and highways extending in all directions and convenient transportation. Relying on the management system and after-sales service network, the company has won unanimous praise from customers and is deeply favored by customers. Welcome friends from all walks of life to inquire, negotiate and cooperate. The main products of the company are: formwork support, shear wall support, steel back ridge, roof support, stair mold, inclined support, steel support, quick release scaffold, turnbuckle scaffold, aluminum mold. After years of continuous innovation and improvement of shear wall formwork support, Shengchuan building materials has replaced the traditional circular tube building formwork support construction scheme with our new building support products, which has improved the construction quality and speed of shear wall formwork support in construction engineering enterprises!