必发365

Service Hotline:0335-7168696
News
News
News

Be sure to know the knowledge of the new formwork support system

Time:2022-03-16 08:55:37View count:


The new formwork support system lays the formwork according to the design scheme (when laying the formwork from one side to the other, or from the middle to both sides, the elevation of the column head plate shall be leveled with the laying. Never adjust the elevation after the formwork is laid, and there shall be no gap between the column head plate and the top plate);


As a new type of building material, the new shear wall formwork support replaces the traditional steel pipe and wood composite support. With the increasingly fierce market competition, the new shear wall formwork support is deeply welcomed by the construction unit. The construction unit is trying to reduce the cost savings in labor, time and materials, The new shear wall formwork support meets these requirements well.


1. The frame is stable and firm, with strong bearing capacity and high safety factor;


2. Low unit cost and small steel consumption;


3. The disassembly and assembly steps are simple and do not need professional and technical workers. Ordinary workers can see it at a glance, which is in line with the operating habits of workers;


4. The external image of the project is clean and tidy to improve the popularity of the enterprise


At present, the traditional steel pipe wooden composite support can not meet the market demand and will be phased out. The new shear wall formwork support overcomes the shortcomings of the traditional steel pipe wooden support, which can not only meet the needs of cost saving of the construction unit, but also meet the rental business needs of construction equipment rental business.




The new shear wall formwork is composed of horizontal bar, telescopic horizontal bar, vertical bar, crossing bar, external corner lock, internal corner lock, etc. The primary and secondary back plates are made of thin-walled high-quality cold-rolled steel, with small volume and light weight. The weight of the longest part is no more than 30kg. Most parts can be manually handled and disassembled during construction, and the lifting capacity of individual parts is 200t The tower crane below M can complete the vertical transportation of formwork. While the construction project with narrow site has obvious advantages, it can be used for remote rotation.



必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
网站地图网站地图
友情链接:恒峰g22  拉斯维加斯9888  大奖国际  公海彩船  918博天堂  新利体育luck18  pp电子  尊龙凯时  BG大游  鸿运国际  bti体育  鸿运国际