必发365

Service Hotline:0335-7168696
News
News
News

The convenience of new shear wall formwork strengthening support system

Time:2021-12-23 08:51:40View count:




According to the reaction of front-line construction workers and technicians on the construction site, the traditional wooden formwork support system has complex operation and low construction power, and can only be turned around for about 10 times. Using the new shear wall formwork reinforcement system can liberate more than 30% of professional carpenters, the assembly method, simple installation and operation, and significantly shorten the construction period. Moreover, the new process of replacing wood with steel can save energy, reduce consumption and reduce pollution. It can be used for more than 300 times, and the turnover utilization rate is amazing.




At present, the number of employees in the construction industry is about 60 million,. The traditional construction of circular tube wooden formwork, because of its severe dependence on professional carpenters and low scientific and technological content, makes the construction power in the construction industry low and the consumption of raw materials high. The presentation of the new shear wall formwork reinforcement system has changed this situation. As long as the operation is guided by technicians, the front-line workers can easily start, and the self weight is light, which is convenient for workers to carry, reduces the workers' heavy work, greatly improves the construction power, and eliminates the problem of hiring professional carpenters with high salary.


Now, the new shear wall formwork reinforcement and support system has been widely used all over the country, including real estate giants such as country garden, Vanke, poly and Evergrande, which has been widely praised by the industry and demonstrated strong vitality.


Since the fire of the new shear wall formwork reinforcement system on the construction site, many construction units and construction units have observed and studied. The new shear wall formwork reinforcement and support system makes the whole frame structure stable and undeformed through the wall main keel, steel secondary keel, steel clad wood, hook head bolts, internal and external corners and other products, which can bear the huge impact in the process of concrete pouring, truly achieve the construction effect of clean water wall and avoid the construction trouble of rework and repair.



必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
网站地图网站地图
友情链接:尊龙凯时  凯时娱乐  南宫娱乐  尊龙凯时  918博天堂  尊龙凯时  ag8  威斯尼斯wns888入口  尊龙凯时  bti体育  腾博会官网  币游